| 1. | Application of self - balance loading method in shanghai south railway station 自平衡试桩法在上海铁路南站工程中的应用 |
| 2. | The coating protection of large steel structural engineering in shanghai south railway station 上海铁路南站大型钢结构工程的涂装防护 |
| 3. | Shanghai south railway station of metro line 1 was moved entirely in 2004 摘要上海轨道交通1号线上海南站站于2004年顺利整体入地搬迁。 |
| 4. | Application of ultra - low construction techniques of diaphragms in special area in shanghai south railway station was introduced 摘要介绍上海铁路南站特殊地段所采用的地下墙墙顶超低施工技术。 |
| 5. | China has chosen the lunar new year holiday , when 70 million people will travel by rail at the shanghai south railway station but the trains were made abroad 阴历新年为中国法定假日,在这个期间上海火车南站将有七千万人乘据火车但火车是在国外制造的。 |
| 6. | In the paper , the computing method based on the non - steady wind pressure in frequency domain is applied to the calculation of roof structure of shanghai south railway station 摘要为了研究结构参数对复杂大跨空间结构风致振动的影响,以上海南站工程屋盖结构为例,利用基于非定常风荷载的风致动力响应频域分析方法,对结构的抖振响应进行参数分析。 |
| 7. | Based on the central - island and athwart construction method for excavation of large foundation pit of shanghai south railway station of south square in soft soil , the active mechanism of remain mound was analyzed ; the deformation of underground diaphragm wall under the condition of three different remained mound width with or without consolidation was contrasted through centrifuge model test , the effect of remained mound width with or without consolidated on the deformation of diaphragm wall was acquired ; then the deformation of underground diaphragm wall with several different widths of mound was calculated by fem , finally it was presented that the reasonable mound width could be determined according to the diminishing ratio of deformation 摘要以铁路上海南站南广场大型软土基坑采用中心岛结合预留土台逆作法施工为背景,分析了预留土台的作用机理:通过离心模型试验对比研究三种不同土台预留宽度及其加固与否对地下连续墙的变形控制作用,得出了土台预留宽度及土台加固与否对连续墙变形的影响规律;在此基础上,采用有限元模拟计算多组土台宽度下地下连续墙的变形,得出了根据变形减小率来确定合理的土台预留宽度。 |